SR Durhamville Solar Project
Haywood County, Tennessee
October 2026
The Tennessee Valley Authority (TVA) has published the draft Environmental Assessment (EA) of the proposed SR Durhamville Solar project. This review evaluates the potential environmental effects of constructing, operating, and maintaining the proposed 66-megawatt solar facility located approximately 5.1 miles southeast of Durhamville, Tennessee. The solar facility would be constructed and operated by SR Durhamville, LLC. In addition to the No Action Alternative, TVA has evaluated the Action Alternative of purchasing power from the proposed SR Durhamville Solar Project.
Approximately 526 acres of the 715-acre Project Site would be developed, of which 341 acres would be occupied by the placement of solar panels. The Project description, preliminary layout, and environmental impact analyses are presented in this draft EA.
In 2026, TVA completed an Integrated Resource Plan (IRP) and associated environmental impact statement (EIS). The 2026 IRP identified the various resources that TVA intends to use to meet the energy needs of the TVA power service area through 2040, consistent with its least-cost planning obligation and continuing to deliver reliable, resilient, and affordable energy. The 2026 IRP anticipates growth of solar generating capacity in all scenarios analyzed and supports the expansion of solar generating capacity up to 5 gigawatts, as well as up to 5 gigawatts of storage capacity through 2040, depending on the level of load growth and other factors.
Public Involvement
October 2026 – TVA published the draft EA. The public comment period is open from October 22, 2026, through November 9, 2026. Submit your comments here.
TVA will consider all substantive comments received on the draft EA and will incorporate those comments into the final EA, which will be released on January 14, 2026.
Project Schedule
(Dates are subject to change. Unexpected issues may arise, resulting in the need to adjust the schedule.)
| Public Comment Period – Draft EA | October 22, 2026 – November 9, 2026 |
| Final EA/FONSI | Final EA/FONSI January 14, 2027 |
Supporting Document
SR Durhamville Solar Draft Environmental Assessment
Appendix D – Summary of Environmental Features
Appendix E - Durhamville Solar Site JDHD Concurrence Letters
Appendix F - Rare, Threatened, and Endangered Species Lists
Appendix G - Visual Resources Ground-level Photos
Related Documents
Contact
More information on this environmental review can be obtained from:
Neil Schock
NEPA Compliance
[email protected]
400 West Summit Hill Drive, WT 11B-K
Knoxville, TN 37902